Retrieving RFP details
Release
Close
City of South San Francisco
Work includes 1 LS sewer flow control (bypass pumping); 10 EA hand digging (1 ea = 5 LF); 76 ea 6" PVC (SDR 26) spot repair (1 EA = 5 LF); 6 EA 8" PVC (sdr 26) spot repair (1 EA = 5 LF); 8 EA 12" PVC (SDR 26) spot repair (1 EA = 5 LF); 1,145 LF 6" HDPE (SDR 17) pipe bursting; 1,712 LF 6" HDPE (SDR 17) open trench repair & replacement; 302 LF 8" HDPE (SDR 17) open trench repair & replacement; 78 EA reconnect existing ss laterals; 2 EA rehabilitate existing manhole; 10 EA replace existing manhole.
Sanitary Sewer Spot Repair and Rehabilitation Project
zip
Village of Hoffman Estates
Project consists of sanitary sewer rehabilitation project.
Borough of Millerstown
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
South Tahoe Public Utilities District
Work include sewer line spot repair & lateral abandonment services.
Release
Nov 03, 2025
Close
Nov 21, 2025