Town of Sand Lake
Work includes site feature demolition (limited), temporary erosion control, earthwork, compacted aggregate and asphalt paving for walks and vehicle use, cast-in-place concrete walkway, parking striping with signage and concrete wheel stops (not in contract), timber barrier, topsoil and turf grass sodding, planting trees and shrubs, cast concrete bulkhead for boating dock, floating dock and gangway (not in contract), restroom building renovations.
Release
Feb 07, 2025
Close
Mar 21, 2025