City of San Diego
Work includes mobilization, 844 SF of remove and replace existing sidewalk, 166 LF of additional curb and gutter removal and replacement, 1070 sf of cross gutter, 1020 SF of commercial concrete driveway, 4 EA of curb ramps (type a) with stainless steel detectable warning tiles, 7 EA of curb ramps (type c2) with stainless steel detectable warning tiles, curb ramp modified (type c2, per 0101165-24-d) with stainless steel detectable warning tiles and concrete spandrel replacement. See outside link.
Release
Jan 29, 2025
Close
Mar 06, 2025