San Carlos Interconnect and Transmission Pipeline

City of San Diego

Summary

Work includes mobilization, 844 SF of remove and replace existing sidewalk, 166 LF of additional curb and gutter removal and replacement, 1070 sf of cross gutter, 1020 SF of commercial concrete driveway, 4 EA of curb ramps (type a) with stainless steel detectable warning tiles, 7 EA of curb ramps (type c2) with stainless steel detectable warning tiles, curb ramp modified (type c2, per 0101165-24-d) with stainless steel detectable warning tiles and concrete spandrel replacement. See outside link.

Files

No files

Details

Release

Jan 29, 2025

Close

Mar 06, 2025