City of Sandy Springs
Construction of approximately 1275 LF of 6’ sidewalk, installation of new pedestrian signal infrastructure, inductive loop detector replacement, crosswalk striping, and an new accessible curb ramp.
bulk
zip
Release
Aug 14, 2024
Close
Sep 18, 2024