Oregon Department of Transportation
Grading, drainage, structure, paving, signing & roadside development includes 2,100 CY foundation excavation, 306 LF mainline video inspection, 136 LF 18" culvert pipe 5 FT, 122 LF 15" storm sewer pipe 5 FT depth. See outside link.
Release
Aug 16, 2024
Close
Sep 12, 2024