Retrieving RFP details
Release
Close
Elsinore Valley Municipal Water District
Project include gravity sewer main and lift station demolition.
City of Huntington Beach
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
City of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Turtle Mountain Band of Chippewa Indians
Provide construction of BIA 10 and green acres sewer and lift station improvements. 1 LS Mobilization; 1 LS Compaction Testing Services; 1 LS Community Lift Station with Standby Generator, Propane Tank, and Owner Supplied Control Panel; 8,725 LF 8" SDR-35 PVC Gravity Sewer Main; 550 LF 8" SDR-35 PVC Sewer Main Boring & Jacking with 16" Steel Casing; 2,180 LF 8" SDR-35 PVC Sewer Main Pilot Tube Guided Auger Boring with 16" Steel Casing; 7,140 LF 4" Schedule 40 PVC Sewer Service Line; 635 LF 4" Schedule 40 PVC Sewer Service Line Boring & Jacking with 8" Steel Casing; 5 EA House Sewer Connection; 65 EA 4" x 8" Wye Branches; 160 VF Sewer Service Line Risers; 44 EA Sewer Service Line Single Cleanout; 65 EA Sewer Service Line Double Cleanout. See attached file.
Release
Sep 18, 2025
Close
Nov 05, 2025