City of Reno
Work includes removal of existing sidewalk, construction of approximately 1,750' of 10' sidewalk, new ada ramps, landscaping and irrigation replacement, riverbank erosion protection, and protection, relocation, and adjustment of existing streetlights, monuments, benches, and trash cans.
City of Port Orange
Restoration of the existing shooting range berms. This project is to restore the front slope of the berm to ensure long-term stability, erosion control, and continued safe operation of the range.
City of Saint Peters
Provide slope failure repair. The project will remediate the slope failure and replace the existing failed slope with light stone revetment. Traffic and pedestrian control; 0. 3 acre clearing, grubbing, scarifying; contractor surveying and staking; erosion and sediment control; control of water; 1300 cy excavation, benching slope, hauling and disposal (removal of sloughed material); 4000 sf mirafi 160n filter fabric; 60 cy modot type 2 rock ditch liner; 1690 cy modot/msd 7 light stone revetment; 40 sy modot type 5 aggregate; site restoration.
City of Woodinville
Ditch restoration and maintenance.