Summary
Work consists of construction of the road flushing drainage improvements, including installation of a new fire hydrant, waterline appurtenances, storm drainage piping, manholes, outlet protection, and associated site grading and drainage improvements. The work also includes demolition and removal of select existing facilities, culvert cleaning and extension, erosion and sediment control, traffic control, utility coordination, and restoration of disturbed areas. Incidental work includes all excavation, dewatering, bedding, backfill, testing, surface restoration, and other appurtenant items necessary to complete the project as shown in the contract documents.