Retrieving RFP details
Release
Close
University Of Florida
Pool renovation.
Metropolitan State University
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
City of Leeds
Pool Plumbing and Structure: Remove and replace 13 skimmers (maximum two skimmers per 2 1/2" line). Skimmers must enter the interior pool wall; concrete throats are to be eliminated. All skimmers and returns must be membrane ready. Skimmer placement: 2 on each end, 5 on one long side, 4 on the opposite long side. Relocate existing return fittings, patch old holes. Install 18 new returns via bore drilling, spaced no more than 20' apart, starting 5' from each end. No more than 3 fittings per 2" pipeline. Install safety grip coping stones (2' x 10 5/8") around the entire pool perimeter. Stones must be grouted and sealed. Install 60ml hot-air welded PVC membrane across the pool interior. Replace main drains with 24" stainless steel sumps bonded to the grid. Pressure test piping to equipment room prior to connection. Bid assumes existing 6" piping passes pressure test; if not, a change order must be submitted and approved. The City reserves the right to manage concrete removal/replacement locally if new 6" lines are needed. Pool Separation: Small pool must be fully isolated from the main pool to prevent cross contamination and ensure proper turnover rates. Required Equipment: (1) 10HP 3-phase Pentair EQ pump. (4) 140K BTU 3-phase heat pumps. (3) 620XF cartridge filters, each with an extra set of cartridges. Complete white goods and valve system for manifold control and winterization. 6" Schedule 40 suction and return lines (rated for temperature and pressure) in equipment room. Note: Schedule 40 drainpipes is prohibited for pool plumbing. ADA-compliant lift (socket fit, removable for storage). Pressure testing required for all lines. Existing chemical control and injection pumps will be reused; Hawkins is responsible for chemical tanks Additional Work (By City or City Subcontractors): Electrical and HVAC installations. All necessary permits. Remove 4' of concrete around pool perimeter and excavate for plumbing access. Provide pea rock and backfill excavated area. Repour concrete deck with step for coping stone. Install or modify deck drain system as needed Pool Specifications: Dimensions: 35' x 88'. Depth: 3' 6" (shallow end) to 12' (deep end).
City of Terre Haute
Park pool renovation.
Release
Oct 15, 2025
Close
Nov 10, 2025