Town of Newtown
Work consists of the complete removal of the existing bridge and installation of twin 12' x 6. 5' precast concrete box culverts with cast-in-place concrete u-walls and associated riprap and natural channel material. The project also includes road reconstruction, storm drainage, bituminous curbing, bituminous concrete driveways, metal beam rail and bridge railing, turf establishment, and the installation, maintenance and removal of erosion control measures.
Release
Jun 26, 2025
Close
Jul 30, 2025