Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Department of Veterans Affairs Regional Offices
Replacement coils for buildings. The Contractor Shall Furnish and Install all Original Equipment Manufacturer (OEM) Chilled Water Coils, Steam Coils and all labor and materials to provide complete replacement as per the scope of work for the replacement of the bad chilled water and/or steam coils in the buildings.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Montgomery Water Works and Sanitary Sewer Board
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Montgomery Water Works and Sanitary Sewer Board
Close: Jan 8, 2026
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
The University Of Tennessee System
The University of Tennessee seeks a Designer to provide architectural, engineering, and consulting design services (through the Design Development Phase) for new 4‑H STEM centers and cabins at multiple UTIA sites (Lone Oaks, Clyde York, Clyde Austin, Ridley). Scope includes preparation of design and contract documents, construction administration as required, and coordination with CM/GC delivery; designers must be registered with the Office of the State Architect and submit a qualifications statement per RFQ requirements.
Posted Date
Nov 11, 2025
Due Date
Dec 9, 2025
Release: Nov 11, 2025
The University Of Tennessee System
Close: Dec 9, 2025
The University of Tennessee seeks a Designer to provide architectural, engineering, and consulting design services (through the Design Development Phase) for new 4‑H STEM centers and cabins at multiple UTIA sites (Lone Oaks, Clyde York, Clyde Austin, Ridley). Scope includes preparation of design and contract documents, construction administration as required, and coordination with CM/GC delivery; designers must be registered with the Office of the State Architect and submit a qualifications statement per RFQ requirements.
United States Department of Veterans Affairs Police
Provide renovate bldg 143 4j shower floors. The Contractor shall remove the existing flooring in all 20 bathrooms in Building 143, 4 th floor, Area J.Install a new waterproof membrane and tile flooring with a threshold/barrier-free design that ensures proper drainage to the existing drain locations. See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 23, 2025
Release: Nov 7, 2025
United States Department of Veterans Affairs Police
Close: Dec 23, 2025
Provide renovate bldg 143 4j shower floors. The Contractor shall remove the existing flooring in all 20 bathrooms in Building 143, 4 th floor, Area J.Install a new waterproof membrane and tile flooring with a threshold/barrier-free design that ensures proper drainage to the existing drain locations. See attached file.
AvailableTownship of Marlboro
Provision of door removal and replacement at various buildings for the township.
Posted Date
Nov 15, 2025
Due Date
Dec 10, 2025
Release: Nov 15, 2025
Township of Marlboro
Close: Dec 10, 2025
Provision of door removal and replacement at various buildings for the township.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →