Dept. of Army, 144 FW/LGC
Replace the existing gas valve and gas regulator at building 100. The work includes but is not limited to the following: Replacing one (1) 2-1/2” main natural gas valve at building 100. Replacing one (1) gas regulator with a new gas regulator building 100.
Release
Aug 22, 2024
Close
Sep 12, 2024