Retrieving RFP details
Release
Close
Illinois Capital Development Board
Replace flooring.
810-022-006 Revised Solicitation General
Base Alameda (00031)
The contractor replace various types of flooring. The contractor will provide all labor, materials, services, equipment, and supervision to remove old flooring, install new flooring, and ensure proper disposal of all debris. New flooring colors will be chosen by the customer, and the project should adhere to specified standards and timelines as outlined in the contract.
Base Alameda (00031)
Contractor remodel an approximately 230 SQ FT galleystyle kitchen to match the existing layout and replace the range with a new government-furnished commercial range, remove and replace all cabinets, and replace the kitchen sink.
Columbia Association
Flooring services include, but are not necessarily limited to: removal of existing flooring and wall covering such as vinyl composite tile, ceramic tile, porcelain tile, rubber flooring, sports flooring, vinyl plank flooring, carpet and stair treads. Supply and installation of flooring and wall covering such as vinyl composite tile, ceramic tile, porcelain tile, rubber flooring, sports flooring, vinyl plank flooring, carpet and stair treads.
Colton Joint Unified School District
Flooring Installation.
Release
Sep 20, 2025
Close
Oct 28, 2025