Retrieving RFP details
Release
Close
Cornell University
Replace the 1009 fire pump and controller, provide a tie into Ives hall for future redundant pumping infrastructure, update the attic sprinkler system and provide a backflow preventer (BFP) upstream of the fire pump.
257-Network Contract Office 17 (36C257)
Replace Chilled Water Pump and VFD #4.
City of Baltimore
Project includes replace the obsolete sprinkler system in the forrest street garage and install a new electric fire pump system at the monument street warehouse to serve the entire complex (garage, warehouse, and office building). The demolition subcontractor shall provide all labor, equipment, and means necessary to perform selective demolition and removal work. See outside link.
Town of Marblehead
Work consists to replace siding on one side of the Fire Station located at 1 Franklin Street. Siding Removal and Disposal; Window Removal and Framing; Weather Barrier Installation; Siding Installation; Soffit, Fascia, and Gutter Work.
Release
Sep 17, 2025
Close
Nov 06, 2025