Retrieving RFP details
Release
Close
Ohio Department of Natural Resources
Front half closest to sugar shack: Mill out area 20"x160"x2", clean this area to be paved, pave with 448 asphalt totaling 2" in depth, compact and roll area, rubber around the area. 2. Back half of large parking lot, the wooded side, is to be overlaid as to make the space smooth, no noticeable transitions. See attached files and outside link.
Repaving of Sugar Camp Road to include Small and Large Parking Lots at Hueston Woods State Park
zip
Chester Sewer District
Work includes milling and proper disposal of the existing driveway asphalt surface, installation of new base and surface asphalt (approx 445 LF by 20' wide), installation of a 6" soil cement base, installation of a 3" hot mix asphalt type c surface course, erosion and sedimentation control measures, installation of 4" PVC conduit under driveway, cleaning of ditch entrance and exit at the existing culvert pipe, implementation of ingress and egress traffic control and safety measures.
City of Cleveland Heights
Repave the city parking lot.
City of Newton
Work includes snow plowing, shoveling, and salting of schools, parking lots, walkways, stairways, etc.
Release
Oct 14, 2025
Close
Nov 06, 2025