Logo

starbridge

Book a Demo
RFPs/Repairs and Resurfacing of Track at Reno High School

Repairs and Resurfacing of Track at Reno High School

Washoe Co School District

Summary

Repair approx. 50 SF of worn or lifted surfacing. Add approx. 350 SF of additional track CONICA Conipur (or Owner Approved Equal) athletic surfacing to specified location within the D zone. Sand/level as necessary and retop entire track, D-zones, high jump, long jump, and pole vault runways (approx. 48,785SF) with 2 coats of Conica Conipur retop. See CONICA Conipur SP specifications and manufacturer instructions (or Owner Approved Equal). Athletic surface color and striping to match existing.

Files

25-55-B-01-DA - SPEC BOOK

pdf

Details

Release

Jan 28, 2025

Close

Feb 24, 2025

Contacts

Source