Logo

starbridge

Book a Demo
RFPs/Repair Asphalt Runway 14-32 Phase 4

Repair Asphalt Runway 14-32 Phase 4

Dept. of the Air Force, Air Mobility Command, 436th CONS

Summary

The project consists of providing all labor, materials, and equipment necessary to repair 2100 LF Runway 14-32. 1. Rotor mill an area 150 LF x 2100 LF to a depth of 2". 2. Repave 150 LF x 2100 LF with 2" PG 76-22 binder FAA Mix in accordance with UFC 3-260-02. Groove new pavement in in accordance with UFGS 32 01 18.71(Grooving of Airfield Paving). 3. Crack seal 4200 LF (2100 LF x 2) 25 FT wide shoulder areas. 4. Restripe all demolished stripes/ markings with retroreflective (Type 1 or Type III beads) & white paint. Markings consists of 11 - 120 LF long arrows.

Files

No files

Details

Release

May 22, 2025

Close

Jun 06, 2025

Contacts

Source

Get a Free RFP Download