Retrieving RFP details
Release
Close
City of Milwaukee
Work consist of install a solid walled downspout extension (color-matched) bend and extension, chimney repairs, front entry porch (concrete) repair, door repair, rear entry door - repair, alarms, electrical service upgrade, gfci receptacles - kitchen counter, new kitchen circuits and receptacles, bathroom gfci receptacle, entry light fixture, new light fixtures, door slab replacements, kitchen flooring, kitchen cabinets, kitchen countertop, bathroom medicine cabinet, bathtub, surround and valve, bedroom ceilings - plaster repair and painting.
Remodeling and Repairs - 4965 N 20th St *RE-BID*
zip
City of Milwaukee
Work incldues concrete expansion joint: clean and reseal the expansion joint along the south side of the home where the driveway meets the home; front entry porch (wood): prep, prime and paint the entire wooden front entry porch; siding repairs: repair or replace all loose or damaged existing cedar shake on the front and side dormers and replace with matching siding. Caulk all joints, seams, edges, and fastener holes and with paintable/stainable sealant as needed, then finish paint/stain all areas of shake. Color/s per owner; vinyl window replacement: replace the broken vinyl slider window in the 2nd floor of the front gable. New window to be best possible match to existing. Install to include proper insulation with spray foam and caulking on the both the interior and exterior of the window. See attached file.
City of Milwaukee
Trim all tree branches encroaching on front (west) house roof & walls elevations, minimum 8' clearance. Remove and replace defective/missing concrete service walk, front (west), adjacent to front wood porch step. form, grade, pour and broom finished all new concrete. Include all necessary reinforcement, expansion felt etc. Back fill with screen topsoil, seed and straw. Install new chain-link galvanized 4' height fencing to southwest, open yard area, rear entry door include front and rear chain link galvanized fence gates, all necessary hardware, latched and lock, etc. Remove and replace non-conforming front (west) wood, porch steps, complete with new guard/step/graspable, railings both open sides. See attached file.
City of Thomaston
Work to be completed for the Avenue N Stormwater & Road Repairs is described briefly as follows: In general, construction shall consist of installation of approx. 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading and stream channel improvements.
Release
-
Close
Nov 05, 2025