Minnesota Department of Administration
Contract that includes: general, mechanical, demolition, remediation, and electrical construction. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. The existing pharmacy is being relocated from level 1 to level 2. The vacated space in level 1 will be used for a procedure suite with electroconvulsive therapy (ECT) unit, dental and clinical services. Requires coordination with medical, dental and pharmacy equipment vendors during construction, manufactured sound and vibration control components.
Release
Apr 15, 2025
Close
May 16, 2025