Retrieving RFP details
Release
Close
City of Boulder City
Work includes 605 SY of full depth bituminous pavement section removal, 30 SY of full depth concrete pavement section removal, 110 LF of removal of pcc curb and gutter, 33575 SY of removal of foreign substances/contaminates and surface preparation, 8870 LF of fine ac pavement surface grinding (variable width), 4280 SF of removal of pavement markings, 1 LS of removal of waterline pipe and buried structures, 4 EA of removal of bollards and foundations, 3 EA of salvage and reinstall signage, airport safety and security, traffic control. See outside link.
BVU_AIG_35_Reconstruct Access Road RepackagingRebidding_IFB_Front End Specs
City of Boulder City
Work shall include reconstruct access road repackaging/rebidding project at the city municipal airport. Project will include reconstruction of access road using asphalt pavement, using concrete pavement, water line relocation, retaining wall installation, gate replacement, and associated electrical improvements.
New Mexico General Services Department
Alluvial drilling, rotary drilling, grout injection pipe, backfill and surface restoration, hand seeding and mulching, road repairs.
City of Chino Hills
Work comprises, but is not limited to: mobilization, traffic control, grind existing pavement up to 4" deep; install AC overlay up to 4" thick; reconstruct ADA access ramps; adjust utility covers and valve lids to finished grade; reconstruct concrete sidewalk; reconstruct curb and gutter; restore striping; pavement legends, and pavement markers.
Release
Jun 09, 2025
Close
Nov 17, 2025