Retrieving RFP details
Release
Close
Indiana Department of Transportation
Small structure replacement and bridge deck overlay. Work includes clearing right of way; 1,241 CY of common excavation; 526 Ton type C widening with HMA; 16 SY of 1 1/2" asphalt milling; 3,609 SY of 2" asphalt milling; 1,013 LF of 6'3" spacing; MGS W-beam guardrail; erosion control; waterproofing; signage; pavement markings. See attached files for complete scope of work.
R-41527-A - Intersection Improvement, Roundabout **REBID**
zip
Indiana Department of Transportation
HMA overlay, small structure replace and bridge deck overlay. Work includes clearing right of way; 1,725 CY of common excavation; 5,617 LF of linear grading; 5,928 Ton type D full depth HMA patching; 263,708 SY of 1 1/2" asphalt milling; 220 LF of reset guardrail; 171 SY of erosion control blanket; 373 SY of sodding; 458 LF of video inspection for pipe; 1 Ea type C4 manhole; pavement markings. See attached files.
Indiana Department of Transportation
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
Indiana Department of Transportation
Approx. 60 CY Excavation, common; 800 SY milling, transition; 1,845 SY asphalt for tack coat; 180 LF guardrail, mgs w-beam, 6 ft 3 in. Spacing; 58 SY sodding; 2.20 CY concrete, C, superstructure; 415 SF bridge deck patching, full depth; 920 SY bridge deck overlay, latex modified; 100 SF bridge deck patching, partial depth. See attache file.
Release
Nov 12, 2025
Close
Dec 10, 2025