Logo

starbridge

Book a Demo
RFPs/Pump Station 1-1 and 2-1 Rehabilitation (ITB)

Pump Station 1-1 and 2-1 Rehabilitation (ITB)

Garrett County

Summary

Work consist of remove and replace the existing (vertical run) 150 lb. Class, 16" flanged DI discharge piping, pump bases, 90-degree pump base elbows, 2" stainless steel pump guide rails approx. 16' in length, 16" DI 90-degree elbow for each of the 40 hp submersible sewer pumps. Each discharge pipe is approx. 6' in length. All new piping, fittings and fasteners shall be stainless steel. Stainless steel piping shall be wear resistant and thick walled.

Files

523340df6e1a4458b82628239ce6c23a

pdf

Details

Release

Jan 04, 2025

Close

Feb 06, 2025

Contacts

Source