Retrieving RFP details
Release
Close
City of Raleigh
Project consists of improvements to the shoreline retaining walls. Work includes removal and replacement of most sections of the existing concrete retaining wall along the lake perimeter and island shorelines; installation of new modular concrete wall systems and cast-in-place concrete walls; removal and replacement of adjacent concrete walkways.
Pullen Park - Lake Howell Shoreline Wall Replacement *Re-Bid*
zip
City of Richland
Demolition of an existing, failed basalt column shoreline retaining wall and replacement with a new, mechanically stabilized earth (MSE) precast concrete modular block wall with geogrid reinforcement. The work also includes appurtenant traffic control, wall drains, backfill, handrailing, asphalt and concrete pavement surface restoration, and other incidental work.
City of Mountain View
Demolition and in-kind replacement of the deteriorated play structure and adjoining wooden deck. Replacement and regrading of approx. 3,600 SF of the existing asphalt pathway leading to the playground to address ADA non-compliance.
City of Arvada
Removal and replacement of the park east synthetic soccer fields. The area is 155,250 SF (77,625 per field) square feet, and the work includes removal and disposal of the existing synthetic turf and infill, base preparation, nailer board inspection and replacement as needed, and installation of new synthetic turf system and infill.
Release
Sep 11, 2025
Close
Nov 03, 2025