Retrieving RFP details
Release
Close
City of Manteca
Provision of qualified firms for professional engineering services, select a consultant to assist the city with the development of project approval and environmental document (pa&ed) for the state route 120 / airport way interchange and the state route 120 / main street interchange projects.
Project Approval and Environmental Document (PA&ED) for State Route 120 / Airport Way Interchange and State Route 120 / Main Street Interchange (RFP)
zip
Loudoun County
Project includes a grade separated barbell interchange at the existing Route 690 (Hillsboro Road) overpass over the Route 7 bypass. This will consist of a new Route 690 bridge with 2 (two) roundabouts on either side, on and off ramps from Route 7, widening of Route 7 and its two (2) bridges over Catoctin Creek, and two (2) stormwater facilities. The general scope of work includes, but is not limited to, all surveying, construction layout, maintenance of traffic, earthwork (including the removal of unsuitable material), rock excavation, erosion & sediment control, other environmental controls.
Riverside County Transportation Commission
Provide construction management services for street interchange improvements project.
City of Littleton
Owner's Representative to manage and oversee design and construction for the Main Street Improvements - Phase I of Project Downtown. The Owner’s Rep should bring expertise in project management, urban design coordination.
Release
Oct 06, 2025
Close
Nov 03, 2025