Retrieving RFP details
Release
Close
City of Pacifica
Priority parks project involves clearing and grubbing 5782 sf, 6" river washed cobbles 20 sf, 4" pvc solid drain pipe 20 lf, 4" ductile steel drain pipe 6 lf, pedestrian concrete 851 sf, concrete wall 131 lf, fence (4' tall tubular steel) 45 lf, gate (4' tall, 3' wide tubular steel) 2 ea, picnic table (wausau - tf3195) 1 ea, drinking fountain w/ dog bowl (apf-3500-94-q) 1 ea, 3/4 copper pipe to drinking fountain 64 lf, trash receptacle (wausau-ws100) 1 ea, concrete bench (wausau - zb. Ar. 08) 1 ea, irrigation system 1 ls, 24 box trees 5 ea, wood mulch 2500 sf. See outside link.
Priority Parks Project
zip
Orange County Transportation Authority
Provide transit signal priority deployment.
Utah Department of Government Operations
Work includes upgrade main village restrooms.
U.S. Army Engineer District Savannah
Maintenance, repair, minor construction/operations of the hartwell project -savannah district. The purpose of this contract provides services for maintenance, repair, minor construction/operation of the hartwell project to include the project manager's office, campground / day-use parks, boating access areas, dams, power plant, clemson pumping station, other project resources. Activities include: cleaning services; maintaining buildings, structures, security systems, mechanical, electrical, water supply/sewage disposal systems; maintenance of grass, tree.
Release
Oct 21, 2025
Close
Nov 10, 2025