Retrieving RFP details
Release
Close
Kansas Department of Administration
Provide primary electrical system replacement phase 1.
Primary Electrical System Replacement Phase 1 - OSH
zip
Logan County School District
Provide electrical system and fire alarm replacement at man high school.
City of Tescott
Provide water supply system improvements - phase 1. Work includes furnishing all the materials, and equipment for construction of a split faced block building; excavation; backfilling; grading; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; electrical power upgrades; valves, meters, hydrants, & appurtenances; liquid chlorine equipment; submersible well pumps; well pitless units; water well inspections and improvements at both wells; backup generator; piping; installation of 3" & 4" PVC piping; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Mobile County Hospital Board
Wastewater treatment plant primary digester no. 1 cover replacement.
Release
Oct 31, 2025
Close
Dec 02, 2025