Retrieving RFP details
Release
Close
City of Frisco
Work includes but is not limited to sediment removal, temporary storage for drying, testing of removed sediment for contaminants, transportation and disposal to an applicable site while preserving water quality, water volume, and wildlife. 20000 cy dredging and sediment removal; 20000 cy dewatering & handling of sediment (including materials for leveling dewatering pad); 12 per sample sediment testing; site restoration (access, vegetation, erosion control, grading/leveling).
Pond Dredging
zip
City of Twinsburg
2026 Waterford Pond Dredging Phase 1.
City of Rochester
Work includes 120 LF 2" non-metallic conduit; 40 LF 4" non-metallic conduit; 300 CY random riprap class III; 24,000 CY excavation channel and pond; 6,315 SY site restoration.
U.S. Army Engineer District Norfolk
The Rudee Inlet Maintenance Dredging Project will consist of dredging up to approx. 220,000 CY of sandy maintenance material.
Release
Oct 10, 2025
Close
Nov 14, 2025