City of Seattle
Provide design for rehabilitation of two areaways composed of a brick street wall and brick arches with steel support beams as sidewalk support and concrete sidewalk surface. Areaways will require rehabilitating and preserving the areaway structure while enhancing the street wall to support increasing vehicle loads and current seismic design requirements. This project will also resurface the existing sidewalk surface.
bulk
zip
Release
Sep 11, 2024
Close
Sep 13, 2024