Pacific Northwest National Laboratory
Work includes two new rpm lanes will be added at the pier t main gate. New RPM8 systems on concrete pads will be installed, as well as traffic controls and infrastructure to support remote operations, installing visual identification system (vis) cameras; vis lights, traffic entrance and exit lights, lane closure lights, alarm lights, gate arms, laser scanners, and intercoms. A new lane equipment bank containing a power panel, programmable logic controller, equipment cabinet,and rpm all-purpose interface devices (rapids) will be installed at the lanes. Infrastructure for a centralized area video surveillance system (cavss). See attached file.
bulk
zip
Release
Oct 05, 2024
Close
Oct 30, 2024