Logo

starbridge

Book a Demo
RFPs/Phase 2 of 3 Building Construction, Demolition & Sitework At Central Middle School, Bid 2460-24 Through 2493-24

Phase 2 of 3 Building Construction, Demolition & Sitework At Central Middle School, Bid 2460-24 Through 2493-24

Greenwich Public School Dist

Summary

Phase 2 of 3 building construction, demolition & sitework. The project includes approx. 133,500 SF new central middle school project. The overall project consists of the construction of a new building including gymnasium, auditorium, cafeteria and classroom spaces on the north portion of the site where existing fields are currently located. The existing building will be occupied until the new facility is complete and will be demolished once construction is finished. Construction will take place in phases to allow the existing facility to remain functioning. The final site work will include access lanes, parking, athletic fields, and necessary drainage, utilities, and connections. Bid #2460-24 Demolition & Abatement; Bid #2461-24 Sitework; Bid #2462-24 Concrete; Bid #2463-24 Masonry; Bid #2464-24 Structural Steel; Bid #2465-24 Misc. Metal; Bid #2466-24 Waterproofing; Bid #2467-24 Roofing; Bid #2468-24 Fireproofing; Bid #2469-24 Firestopping; Bid #2470-24 Millwork & Casework; Bid #2471-24 Glass, Glazing & Metal Panels; Bid #2472-24 Doors, Frames & Hardware; Bid #2473-24 Drywall & General Trades; Bid #2474-24 Acoustical Ceilings; Bid #2475-24 Ceramic Tile & Terrazzo Flooring; Bid #2476-24 Resilient Flooring; Bid #2477-24 Carpet; Bid #2478-24 Wood Flooring; Bid #2479-24 Painting & Wall Covering; Bid #2480-24 Signage; Bid #2481-24 Lockers; Bid #2482-24 Food Service Equipment; Bid #2483-24Theater Equipment; Bid #2484-24 Fixed Seating; Bid #2485-24 Window Treatment; Bid #2486-24 Elevators; Bid #2487-24 Fire Protection; Bid #2488-24 Plumbing; Bid #2489-24 HVAC & Controls; Bid 2490-24 Electrical & Fire Alarm; Bid #2491-24 Low Voltage & AV; Bid #2492-24 Concrete Flatwork; Bid #2493-24 Landscaping.

Files

No files

Details

Release

Oct 01, 2024

Close

Nov 12, 2024

Contacts

Source