Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Georgia Department of Transportation
Work includes approx. 6,540 SY variable depth milling, 540 TN 12.5 MM superpave recycled asphalt concrete, 523 Gal tack coat, 16 EA raised pavement markers, 0.23 GLM indentation edge line rumble strips-ground in place (continuous).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Georgia Department of Transportation
Work includes approx. 6,540 SY variable depth milling, 540 TN 12.5 MM superpave recycled asphalt concrete, 523 Gal tack coat, 16 EA raised pavement markers, 0.23 GLM indentation edge line rumble strips-ground in place (continuous).
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Georgia Department of Transportation
Close: Dec 19, 2025
Work includes approx. 6,540 SY variable depth milling, 540 TN 12.5 MM superpave recycled asphalt concrete, 523 Gal tack coat, 16 EA raised pavement markers, 0.23 GLM indentation edge line rumble strips-ground in place (continuous).
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Maui
Furnishing of pavement preservation products.
Posted Date
Nov 26, 2025
Due Date
Dec 15, 2025
Release: Nov 26, 2025
County of Maui
Close: Dec 15, 2025
Furnishing of pavement preservation products.
AvailableCity of Bowling Green
Roadway network consisting of approx. 590 paved lanemiles of residential streets, collector corridors, and arterial routes supporting daily travel for residents, business access, freight movement, and emergency services. As pavement ages, oxidation, cracking, moisture intrusion, and traffic loading progressively deteriorate asphalt surfaces, leading to increased maintenance needs and earlier resurfacing cycles. Pavement preservation treatments provide a costeffective method to slow deterioration, extend pavement life, and maintain safe roadway conditions. Strategic preservation investments reduce long-term capital costs, delay major rehabilitation, improve ride quality, and enhance public satisfaction with roadway performance.
Posted Date
Dec 6, 2025
Due Date
Jan 21, 2026
Release: Dec 6, 2025
City of Bowling Green
Close: Jan 21, 2026
Roadway network consisting of approx. 590 paved lanemiles of residential streets, collector corridors, and arterial routes supporting daily travel for residents, business access, freight movement, and emergency services. As pavement ages, oxidation, cracking, moisture intrusion, and traffic loading progressively deteriorate asphalt surfaces, leading to increased maintenance needs and earlier resurfacing cycles. Pavement preservation treatments provide a costeffective method to slow deterioration, extend pavement life, and maintain safe roadway conditions. Strategic preservation investments reduce long-term capital costs, delay major rehabilitation, improve ride quality, and enhance public satisfaction with roadway performance.
Available690567 Western Federal Lands Division
Pavement Preservation.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
690567 Western Federal Lands Division
Close: Dec 19, 2025
Pavement Preservation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →