City of Topeka
This project involves replacing concrete pavement, curbs and gutters, and adding storm drain inlets.
Pavement Improvement & Storm Inlet Project
zip
Earl Township
Storm Sewer and Road Widening Project – Include installation of 277 LF of 15" RCP, 7 inlet boxes, 6 endwalls, 534 SY of road widening along with temporary pavement restoration, removal of existing pipes and structures, and other incidental work.
City of Monterey
Work consist of 5,790 SF of remove concrete curb and gutter, sidewalk, curb ramp, sidewalk crossing, and driveway, 2 EA of salvage parking meter, 41,000 SF of remove ac pavement and base, 150 SF of remove ac dike, 1,300 SF of salvage and reinstall aggregate walkway, 2 EA of reconstruct storm drain inlet (precast curb opening EA), 6 EA of reconstruct storm drain inlet (combination inlet), 15 EA of adjust valve cover to grade, 2 EA of adjust utility box to grade, 2 EA of adjust flushing inlet to grade, 2 EA of adjust manhole cover to grade, 1 EA of replace manhole cone and adjust cover to grade, 2 EA of reinstall wheel stop. See attache file.
City of Murray
Work includes installation of approximately 2,500' of 42" rcp storm drainpipe and 850 feet of 36" rcp storm drainpipe, storm drain trunkline will generally be placed 13 feet deep under the roadway and require dewatering of groundwater, groundwater generally starts 6 feet under the road surface and 7 feet over top of the trench bottom. Additionally, 64 feet of 36-inch pipe and 45 feet of 15-inch storm drainpipe will be placed in 5600 south, installation of manholes and inlet boxes.
Release
Oct 20, 2025
Close
Nov 19, 2025