Retrieving RFP details
Release
Close
Chatham County
Phase 1 of the Park in County to include the creation of an all-encompassing park with playground amenities (with ADA accessible equipment), pump track courses for all age groups, a restroom shelter with attached fishing dock overlooking the central pond, prefabricated maintenance building, and walking trails. Project will include all site work & landscape associated with reworking the existing 23.5 acres of land – including demo and new work where required. Additional phases to come in the future, including the addition of a multi-phased recreation center. Project is in honor of the Parker’s family, local New Hill residents who donated their parcel of land to build for the Chatham County & neighboring communities. Principal trade contractors are solicited for the following bid packages: BP0100 General Trades | $225,000.00 BP0240 Selective Demolition | $50,000.00 BP0300 Concrete | $350,000.00 BP0400 Masonry | $100,000.00 BP0500 Structural Steel | $50,000.00 BP0611 Wood Roof Framing | $100,000.00 BP0615 Wood Dock | $100,000.00 BP0640 Casework & Countertops | $25,000.00 BP0710 Thermal & Moisture Protection | $25,000.00 BP0746 Fiber Cement Siding | $25,000.00 BP0750 Metal Roofing & Gutters | $75,000.00 BP0810 Doors & Hardware | $10,000.00 BP0833 Coiling Doors | $50,000.00 BP0920 Gypsum Board Assemblies | $25,000.00 BP0990 Painting | $25,000.00 BP1000 Specialties | $25,000.00 BP1014 Signage | $25,000.00 BP1334 Prefab Metal Building | $175,000.00 BP2200 Plumbing | $125,000.00 BP2300 HVAC | $25,000.00 BP2600 Electrical | $275,000.00 BP3100 Sitework & Utilities | $3,100,000.00 BP3231 Fences & Gates | $50,000.00 BP3290 Landscape | $600,000.00
Cobb County
Prequalification of New Contractors for Water and Sewer Line Construction, Manhole & Valve Box Adjustments, Cured-in-Place (CIPP) Rehabiliation, Manhole Rehabilitation, and Stormwater Construction.
San Diego Metropolitan Transit System
Provide KMD ZEB Infrastructure Phase 1 - Prequalification of Bidders
University Of Alabama At Birmingham
Building 3rd Floor - CO6 Enabling Project.
Release
May 15, 2025
Close
Dec 09, 2025