Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hawaii Department of Health
Paint office spaces rooms a through i within ecsp, refer to floor plan. This includes the following: room a entry space, room b: office assistant area & kitchen, room c: 2 work station, room d: toddler bathroom, laundry room, hallway, restroom & ceiling, room e: 4 cubicle workstation, room f: 2 cubicle workstation, room g: 3 cubicle workstation & celling, room h: file room & ceiling, room i: manager office & ceiling: - paint office spaces rooms a through i within ecsp, refer to floor plan. - all doors and frames in these rooms. - hallways leading up to the barrier dividing the space between main office area(s) and the adjoining bilingual health aide services office area. - doors into the office (front and back of the 2 doors), to include the main door & door in room 210. - in room 205: all walls in the main area and in the room in the back (aka: workspace #1); the door and frame of the tiled storage closet; door and frame for the kitchen; door and frame for the bathrooms (adult and former child bathroom); door and frame for laundry room; and the walls, door and frame of the toy closet. - vendor provides paint. The paint can should specify the square footage the paint will cover. Approximately 300 sq. Ft per can per coat. - acceptable/preferred paint color (example attached): off white or eggshell white. Color palettes are normally picked up at the location where the paint is purchased from; vendor should provide the color palette as part of bid/offer proposal. - two (2) coats of latex semi-gloss not oil based. Oil based will have a heavier smell, more difficult to clean up. - for areas that the paint is peeling/peeled off will need to prime before painting.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Windward Community Development District
Provide general engineering services as well as engineering services on an ongoing basis and for the design and construction administration associated with the districts capital improvement plan.
Posted Date
Nov 26, 2025
Due Date
Jan 13, 2026
Release: Nov 26, 2025
Windward Community Development District
Close: Jan 13, 2026
Provide general engineering services as well as engineering services on an ongoing basis and for the design and construction administration associated with the districts capital improvement plan.
Available245-Network Contract Office 5 (36C245)
Office space for a veterans center, 2112 NUSF / 2534 ABOA SF.
Posted Date
Oct 8, 2025
Due Date
Dec 14, 2025
Release: Oct 8, 2025
245-Network Contract Office 5 (36C245)
Close: Dec 14, 2025
Office space for a veterans center, 2112 NUSF / 2534 ABOA SF.
AvailableNorthWest Senior & Disability Services
Provide interior painting services for approximately 11,500 sq ft of office space.
Posted Date
Dec 5, 2025
Due Date
Dec 24, 2025
Release: Dec 5, 2025
NorthWest Senior & Disability Services
Close: Dec 24, 2025
Provide interior painting services for approximately 11,500 sq ft of office space.
AvailableUniversity Of Texas Southwestern Medical Center
Shell Space Office Renovations work includes 02 40 00 Demolition; 06 10 00 Rough Carpentry; 07 84 43 Firestopping; 09 29 00 Drywall & Framing; 09 65 13 Flooring; 09 90 00 Painting; 21 10 00 Fire Protection; 23 05 13 HVAC; 26 05 00 Electrical.
Posted Date
Nov 22, 2025
Due Date
Dec 19, 2025
Release: Nov 22, 2025
University Of Texas Southwestern Medical Center
Close: Dec 19, 2025
Shell Space Office Renovations work includes 02 40 00 Demolition; 06 10 00 Rough Carpentry; 07 84 43 Firestopping; 09 29 00 Drywall & Framing; 09 65 13 Flooring; 09 90 00 Painting; 21 10 00 Fire Protection; 23 05 13 HVAC; 26 05 00 Electrical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis