City of South San Francisco
Work consists of 3000 LF of television inspection of sewer main and sewer structure, 5000 TON of off haul and disposal of class II non-hazardous waste excavated material, 19 EA of eccentric cone precast 4' dia manhole, 34 LF of manhole 4' dia, 45 LF of 10" DI sewer main - open excavation, 30 LF of 12" DI sewer main - open excavation, 2989 LF of 18" HDPE DR 17 sanitary sewer main - open excavation, 200 LF of 4" HDPE DR 17 sanitary sewer lateral - pipe burst, 286 LF of 6" HDPE DR 17 sanitary sewer lateral - pipe burst, 253 LF of 8" HDPE DR 17 sanitary sewer lateral - pipe burst, 15000 SY of ac pavement grinding. See attached file.
Oyster Point Blvd Sanitary Sewer Main Reconstruction
zip
Release
Mar 14, 2025
Close
Apr 24, 2025