Retrieving RFP details
Release
Close
Port Of Everett
Work includes improvements to the existing stormwater conveyance and treatment. Work include the removal of an existing stormwater catch basin and piping, replacement with larger-capacity structure and piping, and installation of a stormwater treatment system.
City of Marion
Work inckudes 898 LF of 36" RCP stormwater pipe, 5 new catch basins, remove 6 catch basins & 875 LF of pipe.
City of Richmond
Work includes 1 LS stormwater conveyance system; sormwater drainage from a 41 acre area and discharging it through a new stormwater collection pipeline to a new stormwater outfall.
U.S. Army Engineer District Charleston
Upgrade the stormwater collection and conveyance system in a coastal urban area. This project is one part of a larger effort of similar projects by the city to upgrade stormwater infrastructure along the coast and direct runoff to outfall offshore in a deep spot underwater and away from the beach. This will allow the city to remove hazardous and unappealing concrete pipes that are exposed on the beach.
Release
Oct 14, 2025
Close
Nov 13, 2025