Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fall River Housing Authority
Repair OS&Y valves and sprinkler room piping.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Naval Supply Systems Command (NAVSUP)
4 ea, valve, y, NSN: 4820016221972, P/N: 90800 3/4-3514ACN1-5.0.
Posted Date
Oct 23, 2025
Due Date
Dec 3, 2025
Release: Oct 23, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 3, 2025
4 ea, valve, y, NSN: 4820016221972, P/N: 90800 3/4-3514ACN1-5.0.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Nashoba Regional School District
Project includes but not limited to remove and replace the dry pipe feed main and loop main; replace approximately 115 linear feet of 4" dry-pipe main extending from the sprinkler riser; replace the existing air compressor and pressure regulation assembly with a new unit of equivalent or greater capacity. See attached file.
Posted Date
Nov 11, 2025
Due Date
Dec 5, 2025
Release: Nov 11, 2025
Nashoba Regional School District
Close: Dec 5, 2025
Project includes but not limited to remove and replace the dry pipe feed main and loop main; replace approximately 115 linear feet of 4" dry-pipe main extending from the sprinkler riser; replace the existing air compressor and pressure regulation assembly with a new unit of equivalent or greater capacity. See attached file.
AvailableTownship of Maplewood
Furnishing and installing a new wet sprinkler system inclusive of all piping with either upright or horizontal sidewall sprinkler heads as described in the specifications.
Posted Date
Nov 19, 2025
Due Date
Dec 11, 2025
Release: Nov 19, 2025
Township of Maplewood
Close: Dec 11, 2025
Furnishing and installing a new wet sprinkler system inclusive of all piping with either upright or horizontal sidewall sprinkler heads as described in the specifications.
AvailableAvon Housing Authority
Provide 24-hour on-call as needed sprinkler and fire alarm repair and preventative maintenance.
Posted Date
Nov 19, 2025
Due Date
Dec 11, 2025
Release: Nov 19, 2025
Avon Housing Authority
Close: Dec 11, 2025
Provide 24-hour on-call as needed sprinkler and fire alarm repair and preventative maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →