Retrieving RFP details
Release
Close
Volusia County
Open channel debris and sediment removal and bank stabilization related to damages.
Open Channel Debris and Sediment Removal and Bank Stabilization Related To Damages Caused By Hurricane Milton
zip
City of Venice
Work includes to cut, remove, and haul to an approved disposal site all trees and snags in the water or at risk of falling in the water within the project area, cut trees shall be flush cut to stump, waterway debris removal.
City of Bay Saint Louis
Work includes Bank stabilization and cleaning of sediment and debris from main drainage channels, drainage culvert replacement.
Town of Fountain Hills
Providing professional services consisting of "dam sediment removal & maintenance" (the "services"); sediment removal: excavation and proper off-site disposal of accumulated sediment from upstream and downstream storage areas, including all hauling and dust control. ; structural maintenance: cleaning, repair, and/or reconstruction of inlet and outlet control structures, including trash racks, energy dissipators, sluiceways, spillways, and reinforced channels; headwall and culvert repair: repair or reinforcement of damaged concrete headwalls, culverts, wingwalls, and low-flow channels as identified in inspection reports or task orders. See outside link.
City of Canon City
Cemetery debris removal.
Release
Oct 05, 2024
Close
Oct 30, 2025