Town of Sullivan's Island
Work consists of stabilization of eroded slopes through the installation of an envirolok retaining wall system, construction of a previous path to improve pedestrian safety, reinforcement of concrete structure to improve stability and a variety of native plantings to enhance the user experience.
bulk
zip
Release
Aug 19, 2024
Close
Sep 20, 2024