Logo

starbridge

Book a Demo
RFPs/Old Trolley Bridge Rehabilitation (RFP)

Old Trolley Bridge Rehabilitation (RFP)

Town of Sullivan's Island

Summary

Work consists of stabilization of eroded slopes through the installation of an envirolok retaining wall system, construction of a previous path to improve pedestrian safety, reinforcement of concrete structure to improve stability and a variety of native plantings to enhance the user experience.

Files

bulk

zip

Details

Release

Aug 19, 2024

Close

Sep 20, 2024

Contacts

Source

Get a Free RFP Download