Orondo School District 13
Remodel the lower floor of the district Old School House with limited updates to the main floor in order to facilitate a new early learning center. Scope of work includes Upgrade of 4 exterior entrances doors, Revise east stairwell to serve main and lower floor, Abate the remaining asbestos containing building materials as demolition progress allows, Cut out and re-pour a section of lower floor slab to inset the new wheelchair lift 3" below adjacent finish floor. Additional plumbing cuts, Provide ADA access to main and lower floors via a new wheelchair lift, Remodel lower floor with four early learning classrooms, restrooms, reception, future kitchen, mechanical room, and egress, Relocate electrical service, electrical panels and fan-coil unit. Install new duct-work from fcu to serve some areas and install new mechanical minisplit systems to serve the remaining areas, Upgrade lighting to LED both floors, Provide electrical raceways for owner-installed life/safety, surveillance and data network low voltage systems, Install a new septic pressure system including a lift-station and dosing tank.
OSD ELF Bid 2024
zip
Release
Oct 01, 2024
Close
Oct 30, 2024