Retrieving RFP details
Release
Close
Clay County
Work includes erosion control, mowing, clearing and earthwork, 280. 89 CY regular excavation, 3963 SY milling existing asphalt pavement, 1 1/2" avg depth, 456 TN superpave asphaltic conc, traffic c, 495 TN asphalt concrete friction course,traffic c, fc-12. 5, pg 76-22. See attached file.
Old Jennings and Long Bay Traffic Signal and Intersection Improvements
zip
City of Richland
Work includes widening the intersection, reconstructing the approaches, the extension of the existing corrugated metal arched culverts, replacing the existing guardrail and terminal end sections, temporary pavement markings, permanent pavement markings, and the milling, widening, and overlaying, installation of a four-way traffic signal system.
City of Duarte
Provide traffic signal and intersection improvements includes removal of existing traffic signal equipment, removal of conflicting signing and striping, installation of new signing and striping, installation of new traffic signal system, removal of existing ADA ramps, removal of existing sidewalk, installation of new ADA ramps, installation of new sidewalk, and installation of new bulbouts.
Township of Ontelaunee
Traffic signal and school flasher improvements.
Release
Sep 26, 2025
Close
Nov 03, 2025