City of Tallahassee
Replacement of approximately 9,600 LF of existing 8" diameter water mains with 8" and 12" diameter water mains, replacement of water services and meter settings, replacement of existing fire hydrants, and addition of new fire hydrants. The project includes asphalt patching, milling and resurfacing, concrete curb and gutter replacement and other surface restoration. Project also includes other items incidental to the infrastructure replacement, such as: disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including sidewalk, curb and gutter, and pavement.
bulk
zip
Release
Aug 04, 2024
Close
Sep 17, 2024