Work includes 2,100 LF of 4" pvc c900 dr18, 20,500 LF of 6" pvc c900 dr18, 100 LF of 8" pvc c900 dr18, 2,620 LF of 10" pvc c900 dr18, 240 LF of bore & install 16" steel casing, 0.188 thick, 690 LF of bore & install 12" steel casing, 0.188 thick, 320 LF of bore & install 10" steel casing, 0.188 thick, 2,330 LF of directional bore & install 12" hdpe sdr 11, 2,328 LF of install 6" hdpe sdr 11 watermain in 12" hdpe sdr 11 pipe, 28 EA of pvc to pe transistion, 11 EA of 4" gate valve & box. See attached file.