Florida Keys Aqueduct Authority
Work consists of resurfacing three potable water storage tanks, removal of existing coating, surface preparation/priming, and application of the specified protective coatings on all three tanks as well as repair to existing cracks in the tank walls.
Project 2352-18 OR Tank
Release
Feb 27, 2025
Close
Mar 28, 2025