Retrieving RFP details
Release
Close
University Of Alabama At Birmingham
This project involves the modification of the existing chilled water piping system serving imaging equipment within the radiology department. Work will include alterations to existing chilled water piping, installing additional chilled water piping, equipment, and related infrastructure to integrate into the existing system, and modifying HVAC controls serving this area of the building. The project will include general construction, fire protection, plumbing, mechanical, and electrical disciplines.
H205009 NP6 CT Chilled Water Loop Bid Opening Project Summary Sheet
Newton County
Replace heating and chilled water piping.
Clark County
Provide Chilled Water Pump, Chiller Valve & Condenser Water Strainer Replacement
257-Network Contract Office 17 (36C257)
Replace Chilled Water Pump and VFD #4.
Release
Sep 29, 2025
Close
Nov 05, 2025