Logo

starbridge

Book a Demo
RFPs/North Park Spillway Gate Rehabilitation (IFB)

North Park Spillway Gate Rehabilitation (IFB)

Allegheny County

Summary

General construction: work include install temporary work platforms for the replacement of the push/pull rod, brackets, and painting of existing steel. Removal and replacement of a 2.5" nominal diameter push/pull rod and guide brackets as shown on the contract plans. Painting of the gate and existing steel as shown on the contract plans. Furnish and install a gate position plate and gate position indicator as shown on the contract plans. Electrical construction: furnish and install a portable generator as shown on the contract plans. Furnish and install lighting to illuminate the upper level, lower level and bottom of the gate house.

Files

bulk

zip

Details

Release

Aug 08, 2024

Close

Oct 02, 2024

Contacts

Source

Get a Free RFP Download