Harrison County
Work includes 1 LS clearing and grubbing; 4,400 SY removal of existing asphalt; 75 LF removal of pipe; 5 EA removal of roadway sign; 1,050 SY crushed stone base; 300 SY cold milling of bituminous pavement, all depths; 800 TN 12.5-mm, ST, asphalt pavement; 0.18 mile rumble strip; 1 ls thermoplastic traffic markings. See outside link.
10746-20240821091614 HARRISON
Release
Aug 22, 2024
Close
Sep 24, 2024