Retrieving RFP details
Release
Close
City of San Jose
The Project generally involves the destruction and abandonment of one existing non-potable artesian well near digester #3 at Regional Wastewater Facility (RWF). 1 LS mobilization and demobilization, 1 LS water pollution control plan, 1 LS artesian well dewatering, 1 LS well destruction, abandonment, permit and fees, 32 SY site concrete demolition.
ESD 10576 Re-Bid
zip
City of Nixa
Permanent abandonment of one municipal water well, designated as well #1.
Coachella Valley Water District
The Project consists of onsite non-potable water pipelines. The project consists of furnishing and installing approx. 14,450 LF of C900 PVC pipe and installing zinc coated ductile iron pipe with V-Bio Polyethylene encasement, including valves, fittings, restrained joints, all necessary appurtenances, and surface restoration. Additional facilities include: Five (5) meter vaults with electromagnetic flow meters and electronic pressure regulating valves. Six (6) control valve vaults. Six (6) lake discharge structures, 10 LF of Furnish and install 18" steel casing, with minimum 0.25" wall thickness, by open cut method. 2 EA of Furnish and install 8" buried flanged plug valve, including, but not limited to, all necessary appurtenances, restrained fittings, and all related work, 4 EA of Furnish and install 2" combination air valve, including all fittings and appurtenances, 2,461 LF of Furnish and install 8" Class 350, ductile iron, zinc coated, CML, polyethylene encased, non-potable pipeline, including, but not limited to, trenching, backfilling, imported bedding and backfill, compaction, testing, fittings, restrained joints, and appurtenances (Stations 10+00.00 to 34+61).
City of Victoria
Waterline Abandonment.
Release
Oct 08, 2025
Close
Nov 06, 2025