City of Aiken
Work includes: 825 LF of 6" CL50 350 PSI DIP; 255 LF of 2" PEX-A CTS DR9 w/12 gauge copper trace wire; 18 SY of concrete pavement replacement; 11 SY of concrete sidewalk replacement; 130 TN of 6" GAB (patch area above pipe); 850 LF of 4" white solid lines (pvt. prk stall) thermo. - 125 mil; 2 EA of 6"x6" M.J. tee / fire hydrant assembly w/ valve & box & thrust blocking. See attached files.
bulk
zip
Release
Aug 22, 2024
Close
Sep 19, 2024