Summary
Project consists of a new locker room and athletic building on an existing campus. The site work will include rough grading, utility connection/coordi- nation, subsurface drainage work, concrete paving, asphaltic concrete paving, concrete sidewalks, concrete curb and gutter, landscaping, and pre-engineered freestanding canopies. Building construction con- sists of a concrete foundation, concrete slab-on-grade, pre-engineered metal building, masonry veneer, metal panel veneer/trim, metal panel soffits/trim, truncated standing seam metal roof, concrete masonry unit and drywall partitions, millwork, hollow metal frames/doors, wood doors, aluminum entrance systems, building accessories as specified/ detailed, and building plumbing/ electrical/ mechanical/ fire protection systems.